FIDIC 2017  Interactive Flowcharts

Sub-Clause 8.4
 

FIDIC 2017: Advance Warning – Sub-Clause 8.4 – Interactive Flowchart

Click on the picture to open the flowchart

Engineer’s Determination (1)
 

FIDIC 2017: Engineer’s Determination – Situation 1 – Interactive Flowchart

Click on the picture to open the flowchart

Engineer’s Determination (2)
 

FIDIC 2017: Engineer’s Determination – Situation  – Interactive Flowchart

Click on the picture to open the flowchart

Engineer’s Determination (3)
 

FIDIC 2017: Engineer’s Determination – Situation 3 – Interactive Flowchart

Click on the picture to open the flowchart

Engineer’s Determination (4)
 

FIDIC 2017: Engineer’s Determination – Situation 4 – Interactive Flowchart

Click on the picture to open the flowchart

Apply To Become A CCCS/CCDA/CCCA